MEP / Electrical Engineers

Coordination-ready notes for powering and connecting electronic hotel locks and access control components—so your drawings match the real install.

What to coordinate early

  • Power: door power (if applicable), head-end/server, network switches, and any PoE endpoints.
  • Network: VLANs, Wi‑Fi coverage in corridors/guest floors (deployment-dependent), and security policies.
  • Pathways: door frames, hinge-side pathways, and controller/IDF locations.
  • Life safety + egress: confirm local code requirements for locking hardware and fail-safe/fail-secure design.

Final requirements vary by project scope and lock family. We can review your risers and floor plans to confirm assumptions.

Start here

If you send us a door schedule + riser assumptions, we’ll confirm a realistic bill of materials and coordination notes.